
Ash Giddings
Product Manager, Maxava
POWER8 reached IBM end of service in 2024, and IBM i 7.4 the last IBM i release POWER8 can run reaches the end of standard support on September 30, 2026.
Join Tonny Bastiaans, IBM Power Technical Sales Leader EMEA, and Ash Giddings, Maxava Product Manager, as they explain what changes after that deadline, the risks of standing still, and the two practical paths forward: refresh on-premise to Power11 or move native IBM i workloads to IBM Power Virtual Server.

POWER8 is already beyond IBM end of service, while IBM i 7.4 standard support ends on September 30, 2026. This webinar explains what that means for IBM i teams and how to move forward without turning migration into a high-risk project.
Featuring Maxava Product Manager Ash Giddings and IBM Power Technical Sales Leader EMEA Tonny Bastiaans.

Product Manager, Maxava

IBM Power Technical Sales Leader EMEA, IBM
Presentation
Review the POWER8 lifecycle, IBM i 7.4 deadline, Power11 and PowerVS options, and the Migrate Live journey.
Migration
See how Maxava supports migrations between IBM i systems using real-time replication, rehearsal and verified data integrity.
No. IBM i 7.4 is the last IBM i release POWER8 can run, so moving to a newer supported IBM i release requires a hardware or infrastructure change.
Standard support ends on September 30, 2026. Organizations that remain on 7.4 can use IBM Service Extension for a limited period, but it provides a narrower support model and does not add new Technology Refreshes or functional enhancements.
The webinar covers two primary options: refresh to Power11 on-premise, or run native IBM i workloads through IBM Power Virtual Server in the public cloud.
Maxava Migrate Live uses real-time replication between IBM i servers, simulated role swaps and integrity checks so the target can be tested before final cutover, helping minimize downtime and reduce migration risk.
No. The webinar highlights that often the best to evaluate your approach to HA/DR is as part of an on-premise hardware upgrade or a cloud migration. Moving to the cloud does not negate the need for HA/DR.
Ash Giddings and Tonny Bastiaans: Introduction to the session and the five areas covered: the current POWER8 situation, the IBM i 7.4 support deadline, options off POWER8, live migration, and the bigger business-continuity picture.
POWER8 reached IBM end of service across the line in 2024. IBM i 7.4 is the last IBM i release the platform can run, so POWER8 cannot move to IBM i 7.5 or 7.6 without changing hardware or infrastructure. The session also covers diminishing replacement-part availability and the absence of further POWER8 firmware updates.
IBM i 7.4 standard support ends on September 30, 2026. The webinar explains the role of IBM Service Extension after that date and why remaining on 7.4 is a time-limited stopgap rather than a long-term platform strategy.
The presenters discuss how unsupported or unpatched systems can increase exposure over time and why current, resilient platforms are easier to defend in security, compliance and insurance conversations.
Path 1: refresh on-premise to Power11 and retain full control of hardware, data, and network. Path 2: move native IBM i workloads to IBM Power Virtual Server, without owning the physical hardware.
The webinar compares capital investment, maintenance responsibility, deployment speed, data residency and scalability to help IBM i teams evaluate which route fits their business priorities.
Maxava Migrate Live uses real-time replication between IBM i servers, maintains synchronised copies of data, supports integrity auditing and enables simulated role swaps before the final cutover. The objective is a rehearsed, low-risk migration to new hardware or cloud with minimal downtime.
The discussion closes by reinforcing that migration does not remove the need for high availability and disaster recovery. IBM Power Virtual Server can also be used as an HA or DR destination for either on-premise or cloud-based IBM i environments.
Talk with Maxava about your current environment and the fastest, lowest-risk route to a supported IBM i platform.